Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-3548-1000 | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | ||
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Product Training Modules | Input/Output Connector Systems Primer IDC Wiremount Connectors Primer | |
| Standard Package | 100 | |
| Category | Connectors, Interconnects | |
| Family | D-Shaped Connectors - Centronics | |
| Series | 3548 | |
| Connector Style | Center Strip Contacts | |
| Connector Type | Plug | |
| Number of Positions | 24 | |
| Number of Rows | 2 | |
| Mounting Type | Free Hanging (In-Line) | |
| Termination | IDC | |
| Flange Feature | Hollow, Unthreaded | |
| Type | - | |
| Features | - | |
| Contact Finish | Gold | |
| Contact Finish Thickness | 30µin (0.76µm) | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | 3548-1000 | |
| Related Links | 3548, 3548-1000 Datasheet, 3M Distributor | |
![]() | CD74HC243M96G4 | IC BUS TRANSCVR 3-ST 4B 14SOIC | datasheet.pdf | |
![]() | LT3650EMSE-4.2#PBF | IC BATTERY CHARGER LI 12MSOP | datasheet.pdf | |
![]() | CRCW06038R87FKEAHP | RES SMD 8.87 OHM 1% 1/4W 0603 | datasheet.pdf | |
![]() | C4RR307736SBK1 | RACK ASSEMBLED | datasheet.pdf | |
![]() | 70151-1459 | SAFETY EDGE | datasheet.pdf | |
![]() | DPO-3.0-22 | FIXED IND 22UH 3A 50 MOHM TH | datasheet.pdf | |
![]() | APT2X60DC120J | DIODE MODULE 1.2KV 60A SOT227 | datasheet.pdf | |
![]() | 1610F058 | 2.5G DWDM TOSA 120KM | datasheet.pdf | |
![]() | 752201223JPTR13 | RES ARRAY 18 RES 22K OHM 20DRT | datasheet.pdf | |
![]() | 82A0112-12-9CS2630 | CABLE STRANDED | datasheet.pdf | |
![]() | 2A1702-9 | LINE SIDE DEAD FRONT ASSEMBLY | datasheet.pdf | |
![]() | TVS06RF-11-99PD-LC | TV 7C 7#20 PIN PLUG | datasheet.pdf |