Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-55/0324-26-6/9CS2795 | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Cables, Wires | |
| Family | Multiple Conductor Cables | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | 55/0324-26-6/9CS2795 | |
| Related Links | 55/0324-26, 55/0324-26-6/9CS2795 Datasheet, TE Connectivity Raychem Cable Protection Distributor | |
![]() | 2808-4-01-50-00-00-07-0 | CONN PC PIN CIRC .141DIA TINLEAD | datasheet.pdf | |
![]() | YC248-JR-0718RL | RES ARRAY 8 RES 18 OHM 1606 | datasheet.pdf | |
![]() | D38999/26FD18SNLC | CONN HSG PLUG 18POS STRGHT SCKT | datasheet.pdf | |
![]() | ISL28214FBZ-T13 | IC OPAMP GP 5MHZ RRO 8SOIC | datasheet.pdf | |
![]() | STM32F205RBT6 | MCU ARM 128KB FLASH 64LQFP | datasheet.pdf | |
![]() | 09458450009 | CONN DUST CAP FOR RJ45 JACKS | datasheet.pdf | |
![]() | RNR55J4993FRR36 | RES 499K OHM 1/8W 1% AXIAL | datasheet.pdf | |
![]() | 523-26-4400-WH-0007F | MODULAR CBL COILED 7' OPEN END | datasheet.pdf | |
![]() | 800-80-055-20-004101 | CONN HDR 55POS 0.100 T/H R/A | datasheet.pdf | |
| 501MBG-ABAG | OSC PROG 2.5NS 30PPM 3.2X5MM | datasheet.pdf | ||
![]() | 10091767-F0C-30B | XCEDE LEFT 4PVH 6COL | datasheet.pdf | |
![]() | ERJ-PA3F63R4V | RES SMD 63.4 OHM 1% 1/4W 0603 | datasheet.pdf |