Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-55A7468-22-3/6/9-9 | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 2,000 | |
| Category | Cables, Wires | |
| Family | Multiple Conductor Cables | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | 55A7468-22-3/6/9-9 | |
| Related Links | 55A7468-2, 55A7468-22-3/6/9-9 Datasheet, TE Connectivity Raychem Cable Protection Distributor | |
![]() | 6588930-1 | F/O C/A MPO-MPO,12F,MM | datasheet.pdf | |
![]() | VI-26Z-IY-F3 | CONVERTER MOD DC/DC 2V 20W | datasheet.pdf | |
![]() | 78M6618-M/F/P1 | IC PWR MEASUREMENT OCTAL 68QFN | datasheet.pdf | |
![]() | 0691275007 | MOVING MAGAZINE | datasheet.pdf | |
![]() | 35ZLG4.7MEFCTZ4X7 | CAP ALUM 4.7UF 20% 35V RADIAL | datasheet.pdf | |
![]() | 72WHW | STEEL INNER PANEL | datasheet.pdf | |
![]() | REC5-053.3SRW/H2/A/M/CTRL/X2 | DC/DC CONVERTER 3.3V 5W | datasheet.pdf | |
![]() | MS3476W14-18SZ | CONN PLUG 18POS STRAIGHT W/SCKT | datasheet.pdf | |
![]() | AS3709-BQFM-00 | IC REG 7OUT BUCK/LINEAR 32QFN | datasheet.pdf | |
![]() | 90786-1 | DIE, LOWER | datasheet.pdf | |
![]() | PM4HF11R-S-DC24VS | OFF-DELAY WITH RESET SCREW | datasheet.pdf | |
![]() | D38999/26JF28BA | CTV 28C 26#20 2#16 SKT PLUG | datasheet.pdf |