Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-8N4SV76LC-0055CDI | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| PCN Assembly/Origin | Passivation Thickness 12/Sep/2013 | |
| Standard Package | 364 | |
| Category | Integrated Circuits (ICs) | |
| Family | Clock/Timing - Programmable Timers and Oscillators | |
| Series | FemtoClock® NG | |
| Packaging | Tray | |
| Type | VCXO | |
| Count | - | |
| Frequency | 156.25MHz | |
| Voltage - Supply | 2.375 V ~ 2.625 V | |
| Current - Supply | 136mA | |
| Operating Temperature | -40°C ~ 85°C | |
| Package / Case | 6-CLCC | |
| Supplier Device Package | 6-CLCC (7x5) | |
| Mounting Type | Surface Mount | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | 8N4SV76LC-0055CDI | |
| Related Links | 8N4SV76L, 8N4SV76LC-0055CDI Datasheet, Integrated Device Technology (IDT) Distributor | |
![]() | VJ1812Y221KBCAT4X | CAP CER 220PF 200V X7R 1812 | datasheet.pdf | |
![]() | OPB972P55 | SWITCH SLOTTED OPT W/WIRE LEADS | datasheet.pdf | |
![]() | 5-749879-9 | D-Sub Connector Plug, Male Pins 100 Position Panel Mount IDC, Ribbon Cable | datasheet.pdf | |
![]() | P0147NL | FIXED IND 56UH 1.65A 139 MOHM | datasheet.pdf | |
![]() | VE-BTP-MY-S | CONVERTER MOD DC/DC 13.8V 50W | datasheet.pdf | |
![]() | VE-B22-CY-F1 | CONVERTER MOD DC/DC 15V 50W | datasheet.pdf | |
![]() | RNC50H1141FSB14 | RES 1.14K OHM 1/10W 1% AXIAL | datasheet.pdf | |
![]() | RN55E2434FRE6 | RES 2.43M OHM 1/8W 1% AXIAL | datasheet.pdf | |
![]() | RN60D8R10FR36 | RES 8.1 OHM 1/4W 1% AXIAL | datasheet.pdf | |
![]() | 0251.250PF001L | FUSE BOARD MNT 250MA 125VAC/VDC | datasheet.pdf | |
![]() | DF1-15A1.05 | IDC PROTECTOR 15POS 26,28AWG | datasheet.pdf | |
![]() | CTVP00RW-13-35JN | CTV 22C 22#22D SKT RECP | datasheet.pdf |