Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-941-36 | |
| Lead Free Status / RoHS Status | Not applicable / Not applicable | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 3 | |
| Category | Uncategorized | |
| Family | Miscellaneous | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | 941-36 | |
| Related Links | 941, 941-36 Datasheet, Greenlee Communications Distributor | |
![]() | 9T06031A6201FBHFT | RES SMD 6.2K OHM 1% 1/10W 0603 | datasheet.pdf | |
![]() | A22L-TR-6D-10M | SWITCH PUSH SPST-NO 10A 110V | datasheet.pdf | |
![]() | MAX6324EUT46+T | IC SUPERVISOR 4.63V SOT23-6 | datasheet.pdf | |
![]() | 100AWDP1T2B4M2QE | SWITCH TOGGLE DPDT 5A 120V | datasheet.pdf | |
![]() | WSH2818R0250FEA | RES SMD 0.025 OHM 1% 5W 2818 | datasheet.pdf | |
![]() | NKN2WSJR-73-2R3 | RES 2.3 OHM 2W 5% AXIAL | datasheet.pdf | |
![]() | PE-1008CD911GTT | FIXED IND 909.5NH 150MA 1.75 OHM | datasheet.pdf | |
| 3045716 | TERM BLOCK PLUG 1POS 90DEG | datasheet.pdf | ||
![]() | VE-B5V-IY-F2 | CONVERTER MOD DC/DC 5.8V 50W | datasheet.pdf | |
![]() | 935295617598 | BOARD EVAL DAC1627D | datasheet.pdf | |
![]() | 85-194322-14S | CONN PLUG W/SOCKETS | datasheet.pdf | |
![]() | PT01SE20-16P | PTSE 16C 16#16 SKT RECP | datasheet.pdf |