Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-97-3107B22-18S-940 | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | 97-3107B22-18S-940 | |
| Related Links | 97-3107B2, 97-3107B22-18S-940 Datasheet, Amphenol Industrial Distributor | |
![]() | CRCW12105K36FKEA | RES SMD 5.36K OHM 1% 1/2W 1210 | datasheet.pdf | |
![]() | CRA04S083160RJTD | RES ARRAY 4 RES 160 OHM 0804 | datasheet.pdf | |
![]() | V24B24M150B2 | CONVERTER MOD DC/DC 24V 150W | datasheet.pdf | |
![]() | VE-JWD-EX-B1 | CONVERTER MOD DC/DC 85V 75W | datasheet.pdf | |
![]() | VE-J3H-EZ-F2 | CONVERTER MOD DC/DC 52V 25W | datasheet.pdf | |
![]() | RWR80SR110FRB12 | RES 0.11 OHM 2W 1% WW AXIAL | datasheet.pdf | |
![]() | SMCJ5630/TR13 | TVS DIODE 6.05VWM 11.7VC DO214AB | datasheet.pdf | |
![]() | 8N4Q001EG-1054CDI | IC OSC CLOCK QD FREQ 10CLCC | datasheet.pdf | |
![]() | 2132739-1 | IMP,R4PR6C,UNG0.39SN,NONE | datasheet.pdf | |
![]() | 1100.10.060 | CBL GRP 4.0-6.0 MM CD M10X1.5 | datasheet.pdf | |
![]() | MRS25000C5620FC100 | RES 562 OHM 0.6W 1% AXIAL | datasheet.pdf | |
| HS200 68R J | RES CHAS MNT 68 OHM 5% 200W | datasheet.pdf |