Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-AIB6CGMSS1-22-14PS | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | AIB6CGMSS1-22-14PS | |
| Related Links | AIB6CGMSS, AIB6CGMSS1-22-14PS Datasheet, Amphenol Industrial Distributor | |
![]() | HDD15-5-A+ | AC/DC CONVERTER +/-15V 120W | datasheet.pdf | |
![]() | 74ACTQ244SJ | IC BUFF/DVR TRI-ST DUAL 20SOP | datasheet.pdf | |
![]() | T322B684K035AS | CAP TANT 0.68UF 35V 10% AXIAL | datasheet.pdf | |
![]() | 1-1546931-2 | TERM BLOCK HDR 12POS VERT 5MM | datasheet.pdf | |
![]() | M22G102J2-F | CAP CER 1000PF 200V NP0 RADIAL | datasheet.pdf | |
![]() | D38999/26FG11PNL | CONN HSG PLUG 11POS STRGHT PINS | datasheet.pdf | |
![]() | REC3-123.3SRW/H4/C/M | CONV DC/DC 3W 9-18VIN 3.3VOUT | datasheet.pdf | |
![]() | EMI7208MUTAG | IC EMI FILTER 8CH ESD 16-UDFN | datasheet.pdf | |
![]() | VE-B3L-MV-S | CONVERTER MOD DC/DC 28V 150W | datasheet.pdf | |
![]() | VE-J7X-IY-B1 | CONVERTER MOD DC/DC 5.2V 50W | datasheet.pdf | |
![]() | L717DE09P1AMN | D-Sub Connector Plug, Male Pins 9 Position Through Hole, Right Angle Solder | datasheet.pdf | |
![]() | H804208100J0G | 2000 TB SPR CLA WF 45D | datasheet.pdf |