Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-ALBCBS3125906 | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 100 | |
| Category | Cables, Wires - Management | |
| Family | Cable Ties - Holders and Mountings | |
| Series | Air LB | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | ALBCBS3125906 | |
| Related Links | ALBCBS, ALBCBS3125906 Datasheet, Amphenol Pcd Distributor | |
![]() | R941-5 | ROUND SPACER NYLON 5/16" | datasheet.pdf | |
![]() | CRCW060328R0FKTA | RES SMD 28 OHM 1% 1/10W 0603 | datasheet.pdf | |
![]() | CRCW08051R02FNTA | RES SMD 1.02 OHM 1% 1/8W 0805 | datasheet.pdf | |
![]() | 200MSP5T2B1M6QEH | SWITCH TOGGLE SPDT 3A 120V | datasheet.pdf | |
![]() | TRSF23243CDGGG4 | IC DUAL RS232 PORT 48TSSOP | datasheet.pdf | |
![]() | VE-JTV-CZ-F4 | CONVERTER MOD DC/DC 5.8V 25W | datasheet.pdf | |
![]() | VE-25M-IU-F2 | CONVERTER MOD DC/DC 10V 200W | datasheet.pdf | |
![]() | 1N4755A-TR | DIODE ZENER 43V 1.3W DO41 | datasheet.pdf | |
![]() | M55342E12B44B2RWS | RES SMD 44.2KOHM 0.1% 1/10W 0603 | datasheet.pdf | |
![]() | 09031966585 | DIN-SIGNAL C096MS-3 0C1-2-V4 | datasheet.pdf | |
![]() | 2896429 | COVER | datasheet.pdf | |
![]() | KJB0T23F55JA | CONN RCPT 55POS WALL MNT SKT | datasheet.pdf |