Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-BACC63BV22F55S7 | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | BACC63BV22F55S7 | |
| Related Links | BACC63B, BACC63BV22F55S7 Datasheet, Bel Fuse Inc. Distributor | |
![]() | JR25WP-24S | CONN PLUG WATERPROOF 24POS FMALE | datasheet.pdf | |
![]() | 2256-561L | FIXED IND 560NH 5.8A 10.5 MOHM | datasheet.pdf | |
![]() | RWR82S4420FRB12 | RES 442 OHM 1.5W 1% AXIAL | datasheet.pdf | |
![]() | M39003/01-5203/TR | CAP TANT 47UF 5% 6V AXIAL | datasheet.pdf | |
![]() | 316-83-161-41-001101 | Connector Socket 61 Position 0.100" (2.54mm) Gold Through Hole | datasheet.pdf | |
![]() | 316-87-150-41-012101 | Connector Socket 50 Position 0.100" (2.54mm) Gold Through Hole | datasheet.pdf | |
| XC6121A616ER-G | IC WATCHDOG TIMER 6-USP | datasheet.pdf | ||
![]() | FR12TB58 | CABLE DUCT TRAPEZE BRACKET | datasheet.pdf | |
![]() | ATS-08H-106-C3-R1 | HEATSINK 45X40X12.7MM XCUT T412 | datasheet.pdf | |
![]() | AFBR-812FN1Z | TRANSCEIVER | datasheet.pdf | |
![]() | 2M805-004-01M12-5PA | M805 5C 5#16 PIN RECP THRD | datasheet.pdf | |
![]() | CTVS06RF-13-98S | CTV 10C 10#20 SKT PLUG | datasheet.pdf |