Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV06RQW-21-79PD-LC | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors - Housings | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV06RQW-21-79PD-LC | |
| Related Links | CTV06RQW-, CTV06RQW-21-79PD-LC Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | AD7821KRZ | IC ADC 8BIT HS TRACK/HOLD 20SOIC | datasheet.pdf | |
![]() | CW00518K00JS73 | RES 18K OHM 5W 5% AXIAL | datasheet.pdf | |
![]() | RT1206DRD0717K8L | RES SMD 17.8K OHM 0.5% 1/4W 1206 | datasheet.pdf | |
![]() | RG1005V-241-W-T5 | RES SMD 240 OHM 0.05% 1/16W 0402 | datasheet.pdf | |
![]() | 12105A562JAT2A | CAP CER 5600PF 50V NP0 1210 | datasheet.pdf | |
![]() | 5219325F | LED YELLOW DIFF 3MM ROUND T/H | datasheet.pdf | |
![]() | VE-JWF-CW | CONVERTER MOD DC/DC 72V 100W | datasheet.pdf | |
![]() | M55342K08B180DRWSV | RES SMD 180 OHM 1% 0.8W 2010 | datasheet.pdf | |
| 511BAA-CBAG | OSC PROG 3.3V LVDS 50PPM 3.2X5MM | datasheet.pdf | ||
![]() | ATS-21B-32-C2-R0 | HEATSINK 57.9X36.83X11.43MM T766 | datasheet.pdf | |
![]() | MS3459W20-14P | CONN PLUG 5POS STRAIGHT PINS | datasheet.pdf | |
![]() | R5F100LLDFB#V0 | IC MCU 16BIT 512KB FLASH 64LQFP | datasheet.pdf |