Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV06RW-17-99SE-LC | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors - Housings | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV06RW-17-99SE-LC | |
| Related Links | CTV06RW-1, CTV06RW-17-99SE-LC Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | RC1206FR-073K6L | RES SMD 3.6K OHM 1% 1/4W 1206 | datasheet.pdf | |
![]() | 1.30252.6020200 | SWITCH SELECTOR LAT 1X90 FRM L | datasheet.pdf | |
![]() | RC0201JR-071K6L | RES SMD 1.6K OHM 5% 1/20W 0201 | datasheet.pdf | |
![]() | MS3102R22-10S | CONN RCPT 4POS BOX MNT W/SCKT | datasheet.pdf | |
![]() | 1/2-5-1170 | TAPE ALUMINUM FOIL 12.7MMX4.6M | datasheet.pdf | |
![]() | 6826 OR005 | HOOK-UP STRND 17AWG ORANGE 100' | datasheet.pdf | |
![]() | VI-JTV-CZ-F3 | CONVERTER MOD DC/DC 5.8V 25W | datasheet.pdf | |
![]() | 110IMX35D15D15-8 | DC/DC CONVERT QUAD 15V 0.6A | datasheet.pdf | |
![]() | 1883240000 | SLDV-THR 5.00/28/180FLF 3.2BK | datasheet.pdf | |
![]() | ACC15DEYH | CONN EDGE .100 30POS DR LOW P | datasheet.pdf | |
![]() | 801-43-001-10-003000 | Connector Receptacle 1 Position Gold Through Hole | datasheet.pdf | |
![]() | XCR3128XL-VQ100APN | IC CPLD 128MC 9.1NS 144BGA | datasheet.pdf |