Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV06RW-19-11HC | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV06RW-19-11HC | |
| Related Links | CTV06RW, CTV06RW-19-11HC Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | SSQ-123-03-G-D-RA | Connector Receptacle 46 Position 0.100" (2.54mm) Gold Through Hole, Right Angle | datasheet.pdf | |
![]() | EET-UQ2S181HA | CAP ALUM 180UF 20% 420V SNAP | datasheet.pdf | |
![]() | D38999/26MH53PCLC | CONN HSG PLUG 53POS STRGHT PINS | datasheet.pdf | |
![]() | MAX2745ECM+TD | IC GPS RF FRONT END 48TQFP | datasheet.pdf | |
![]() | RN60D1100FBSL | RES 110 OHM 1/4W 1% AXIAL | datasheet.pdf | |
![]() | B82496C3109Z | FIXED IND 1NH 1.8A 20 MOHM SMD | datasheet.pdf | |
![]() | V150B48H150BN2 | CONVERTER MOD DC/DC 48V 150W | datasheet.pdf | |
![]() | 87900-434HLF | HEADER BERGSTIK | datasheet.pdf | |
![]() | 2132596-2 | IMP100,O,H,V4P6C,RG,LEW39 | datasheet.pdf | |
![]() | UPB2V220MHD1TO | CAP ALUM 22UF 20% 350V RADIAL | datasheet.pdf | |
![]() | 3B30-01 | Isolated Voltage Input IC | datasheet.pdf | |
![]() | OP282 | Dual/Quad Low Power, High Speed JFET Operational Amplifiers IC | datasheet.pdf |