Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV06RW-19-32BC | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV06RW-19-32BC | |
| Related Links | CTV06RW, CTV06RW-19-32BC Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | Z0853008VSG | IC 8MHZ Z8500 SCC 44-PLCC | datasheet.pdf | |
![]() | P51-100-A-G-I12-20MA-000-000 | SENSOR 100PSI 1/8-27NPT 4-20MA | datasheet.pdf | |
![]() | VE-B4L-MX-F1 | CONVERTER MOD DC/DC 28V 75W | datasheet.pdf | |
![]() | RN55D1000FRSL | RES 100 OHM 1/8W 1% AXIAL | datasheet.pdf | |
![]() | DJT16E23-35PC-LC | CONN HSG PLUG STRGHT 100POS PIN | datasheet.pdf | |
![]() | M39003/09-0051/HSD | CAP TANT 100UF 10% 20V AXIAL | datasheet.pdf | |
![]() | BQ27541DRZR-G1 | IC BATT FUEL GAUGE LI-ION 12SON | datasheet.pdf | |
![]() | 87827-436HLF | BERGSTIK II 0.100" SNGL ST | datasheet.pdf | |
![]() | 0387700816 | Connector Barrier Block Strip 16 Circuit 0.375" (9.53mm) | datasheet.pdf | |
![]() | VW36103000J0G | 350 TB SPRING PLUG | datasheet.pdf | |
![]() | 70156-2861 | SYSTEM | datasheet.pdf | |
![]() | OP-270GP | DUAL VERY LOW NOISE PRECISION OPERATIONAL AMPLIFIER IC | datasheet.pdf |