Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV06RW-25-20AA | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV06RW-25-20AA | |
| Related Links | CTV06RW, CTV06RW-25-20AA Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | 08055J1R8BAWTR | CAP THIN FILM 1.8PF 50V 0805 | datasheet.pdf | |
| SLP272M080A4P3 | CAP ALUM 2700UF 20% 80V SNAP | datasheet.pdf | ||
![]() | 881545-1 | CONN SHUNT 2POS GOLD W/HANDLE | datasheet.pdf | |
![]() | 1676913-9 | RES 1.24K OHM 1/4W 0.1% AXIAL | datasheet.pdf | |
![]() | CM1250-04QG | TVS DIODE 8.5VC 6UDFN | datasheet.pdf | |
![]() | OSTOQ22B150 | TERM BLOCK HDR 22POS VERT 2.5MM | datasheet.pdf | |
| FK18X5R1C225K | CAP CER 2.2UF 16V X5R RADIAL | datasheet.pdf | ||
![]() | VI-J04-IX-F1 | CONVERTER MOD DC/DC 48V 75W | datasheet.pdf | |
![]() | RWR80N54R9FRB12 | RES 54.9 OHM 2W 1% WW AXIAL | datasheet.pdf | |
![]() | 2-1423159-7 | RELAY TIME DELAY DPDT 125VDC | datasheet.pdf | |
![]() | C0603C0G1H120K030BA | CAP CER 12PF 50V C0G 0201 | datasheet.pdf | |
![]() | DSC1001CI1-058.0000T | OSC MEMS 58.000MHZ CMOS SMD | datasheet.pdf |