Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV06RW-25-20AE | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV06RW-25-20AE | |
| Related Links | CTV06RW, CTV06RW-25-20AE Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | PPPN181BFLC | Connector Header, Bottom Entry 18 Position 0.079" (2.00mm) Gold Surface Mount | datasheet.pdf | |
![]() | SN74F240DW | IC INVERTER DUAL 4-INPUT 20SOIC | datasheet.pdf | |
![]() | 4-103747-0-30 | CONN HEADR BRKWAY .100 30POS STR | datasheet.pdf | |
![]() | GBC50DCSN | CONN EDGECARD 100PS DIP .100 SLD | datasheet.pdf | |
![]() | HMC17DRTN-S13 | CONN EDGECARD 34POS .100 EXTEND | datasheet.pdf | |
![]() | ABM28DSEI | CONN EDGECARD 56POS .156 EYELET | datasheet.pdf | |
![]() | RLR07C2R70GMRE6 | RES 2.7 OHM 2% 1/4W AXIAL | datasheet.pdf | |
![]() | V48C5H100BN2 | CONVERTER MOD DC/DC 5V 100W | datasheet.pdf | |
![]() | PTKM150R-59H | FIXED IND 150UH 4.5A 52 MOHM TH | datasheet.pdf | |
![]() | XC6121C348MR-G | IC WATCHDOG TIMER SOT-25 | datasheet.pdf | |
![]() | VJ0402D330KXXAP | CAP CER 33PF 25V NP0 0402 | datasheet.pdf | |
![]() | 3-1905003-6 | FO C/A LC RED SC XG RED | datasheet.pdf |