Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV06RW-25-43SB-LC | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors - Housings | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV06RW-25-43SB-LC | |
| Related Links | CTV06RW-2, CTV06RW-25-43SB-LC Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | EKMG161ELL220MJ20S | CAP ALUM 22UF 20% 160V RADIAL | datasheet.pdf | |
![]() | C0805C820J1GALTU | CAP CER 82PF 100V NP0 0805 | datasheet.pdf | |
![]() | REC3-0512SRW/H2/C/M/SMD | CONV DC/DC 3W 4.5-9VIN 12VOUT | datasheet.pdf | |
![]() | 1355390-1 | JUN-POW-TIM GEH 2P | datasheet.pdf | |
![]() | 1-1623927-6 | RES 180K OHM 1/4W 5% AXIAL | datasheet.pdf | |
![]() | RNF-100-3/32-BU-STK | HEAT SHRINK TUBING | datasheet.pdf | |
![]() | VI-J6P-CW-F2 | CONVERTER MOD DC/DC 13.8V 100W | datasheet.pdf | |
![]() | CMF65560K00DEEB | RES 560K OHM 1.5W 0.5% AXIAL | datasheet.pdf | |
![]() | PPT0010DFX5VA | PRESSURE TRANSDUCER | datasheet.pdf | |
![]() | ATS-01B-149-C3-R0 | HEATSINK 35X35X20MM L-TAB T412 | datasheet.pdf | |
![]() | 311832-1 | PISTON | datasheet.pdf | |
![]() | MTC100-KT1-0088 | I/O CONN | datasheet.pdf |