Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV07RF-13-32PB-P1 | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV07RF-13-32PB-P1 | |
| Related Links | CTV07RF-1, CTV07RF-13-32PB-P1 Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | 25AA040XT/ST | IC EEPROM 4KBIT 1MHZ 8TSSOP | datasheet.pdf | |
![]() | KUEP-11D17-48 | RELAY GEN PURPOSE DPDT 10A 48V | datasheet.pdf | |
![]() | CRCW1206205RFKEA | RES SMD 205 OHM 1% 1/4W 1206 | datasheet.pdf | |
![]() | SN74BCT2244N | IC BUFF/DVR TRI-ST DUAL 20DIP | datasheet.pdf | |
![]() | MIC5321-SSYMT-TR | IC REG LDO 3.3V 0.15A 6TMLF | datasheet.pdf | |
![]() | KPSE01F16-26SY | CONN RCPT 26POS CBL MNT W/SKTS | datasheet.pdf | |
![]() | CW0104K780KE73 | RES 4.78K OHM 10W 10% AXIAL | datasheet.pdf | |
![]() | RN60E2551FBSL | RES 2.55K OHM 1/4W 1% AXIAL | datasheet.pdf | |
![]() | ATD 2058 | TOOL REMOVAL MS3159-20 | datasheet.pdf | |
![]() | 2200/22SOR-1000 | HOOK-UP STRND 600V 22AWG ORNG | datasheet.pdf | |
![]() | CTVP00RW-11-5JD-LC | CTV 5C 5#20 SKT RECP | datasheet.pdf | |
![]() | D38999/26WE2BB | TV 39C MIXED(TWIN) SKT PLUG | datasheet.pdf |