Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV07RF-13-32PD-P25AD | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV07RF-13-32PD-P25AD | |
| Related Links | CTV07RF-13, CTV07RF-13-32PD-P25AD Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | P-140ASF2X5 | BATTERY PACK 12.0V 1400MAH NICAD | datasheet.pdf | |
![]() | S-80946CNMC-G9GT2G | IC VOLT DETECTOR 4.6V SOT23-5 | datasheet.pdf | |
![]() | TLV5628CDWR | IC 8BIT 10US OCTAL DAC 16-SOIC | datasheet.pdf | |
![]() | TPS3837L30DBVTG4 | IC 2.64V NANOPWR MON SOT-23-5 | datasheet.pdf | |
![]() | NTCLE413E2103F520L | THERMISTOR NTC 10K OHMS WIRE | datasheet.pdf | |
![]() | GCM188R91H473KA37D | CAP CER 0.047UF 50V X8R 0603 | datasheet.pdf | |
![]() | 73550400922 | HANPORT DB9M/F 2XPS/2 W/10' 120V | datasheet.pdf | |
![]() | ATML 3035B | TOOL REMOVAL SET = M81969/30B-35 | datasheet.pdf | |
![]() | DSC1033CI1-033.0000T | OSC MEMS 33.000MHZ CMOS SMD | datasheet.pdf | |
![]() | 1385804-1 | HDM SMPO090F110F LM | datasheet.pdf | |
![]() | SDSP2M110A | SS TIMR RPT CYCLE, 2M ADJ, 110VA | datasheet.pdf | |
![]() | E92F351VNT122MU50T | CAP ALUM 1200UF 20% 350V SNAP | datasheet.pdf |