Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV07RF-9-9PE-P35 | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV07RF-9-9PE-P35 | |
| Related Links | CTV07RF-, CTV07RF-9-9PE-P35 Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | RT0603CRE07294RL | RES SMD 294 OHM 0.25% 1/10W 0603 | datasheet.pdf | |
![]() | IDT74FCT823CTSOG8 | IC D-TYPE POS TRG SNGL 24SOIC | datasheet.pdf | |
![]() | MAX17009GTL+T | IC CTLR VIDEO SERIAL DUAL 40TQFN | datasheet.pdf | |
![]() | VE-2TP-CW-S | CONVERTER MOD DC/DC 13.8V 100W | datasheet.pdf | |
![]() | VE-24N-MY-F1 | CONVERTER MOD DC/DC 18.5V 50W | datasheet.pdf | |
![]() | 10SJV33M5X6.1 | CAP ALUM 33UF 20% 10V SMD | datasheet.pdf | |
![]() | 61500068723 | MULTI-FINISHING WHEEL 8" 2S MED | datasheet.pdf | |
| PKIT4-5MM-101 | PROBE REPLACEMENT KIT | datasheet.pdf | ||
![]() | 2482-052-U2M0-470M | FEED THRU CAP | datasheet.pdf | |
![]() | 09472202005018 | RJI CORD 4AWG22/7TRAI RJ45/M12OV | datasheet.pdf | |
![]() | JS-16DD4 | 16-HOLE NON-INSULATED PANEL | datasheet.pdf | |
![]() | 768143330GPTR13 | RES ARRAY 7 RES 33 OHM 14SOIC | datasheet.pdf |