Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV07RQW-21-75SC-LC | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors - Housings | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV07RQW-21-75SC-LC | |
| Related Links | CTV07RQW-, CTV07RQW-21-75SC-LC Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | CRT26-8WH-100 | HOOK-UP STRND 26AWG WHITE 100' | datasheet.pdf | |
![]() | SGH23N60UFDTU | IGBT 600V 23A 100W TO3P | datasheet.pdf | |
![]() | ERJ-1GEF2210C | RES SMD 221 OHM 1% 1/20W 0201 | datasheet.pdf | |
![]() | RNF14FTD560R | RES 560 OHM 1/4W 1% AXIAL | datasheet.pdf | |
![]() | IXTQ72N30T | MOSFET N-CH 300V 72A TO-3P | datasheet.pdf | |
![]() | DLP-LC-DLP5500-10R | KIT DEV DLP LIGHTCOMANDER | datasheet.pdf | |
![]() | 74479775222 | FIXED IND 2.2UH 700MA 230 MOHM | datasheet.pdf | |
![]() | V72C8E100BG3 | CONVERTER MOD DC/DC 8V 100W | datasheet.pdf | |
![]() | 5214C SL001 | CABLE 25COND 22AWG SLATE 1000' | datasheet.pdf | |
![]() | CDRH6D26NP-6R8NC | FIXED IND 6.8UH 1.8A 54 MOHM SMD | datasheet.pdf | |
![]() | RJSAE508602 | RJ45 STACKED LED 2 PORT | datasheet.pdf | |
![]() | 741X083822JP | RES ARRAY 4 RES 8.2K OHM 0804 | datasheet.pdf |