Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV07RW-25-11P-LC | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors - Housings | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV07RW-25-11P-LC | |
| Related Links | CTV07RW-, CTV07RW-25-11P-LC Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | AC07000003307JAC00 | RES 0.33 OHM 7W 5% AXIAL | datasheet.pdf | |
![]() | M165-AY-12 | PILOT LIGHT 12V INCAND SQR YEL | datasheet.pdf | |
![]() | 9-146304-0-13 | CONN HEADR BRKWAY .100 13POS R/A | datasheet.pdf | |
![]() | MR045A120JAA | CAP CER 12PF 50V NP0 RADIAL | datasheet.pdf | |
![]() | LP332M050C5P3 | CAP ALUM 3300UF 20% 50V SNAP | datasheet.pdf | |
![]() | R1D-0515-R | CONV DC/DC 1W DUAL +/-15VOUT SMD | datasheet.pdf | |
![]() | VE-21J-EV-F1 | CONVERTER MOD DC/DC 36V 150W | datasheet.pdf | |
![]() | 3G3DV-E4110-B001 | AC DRIVE, 460VAC 15HP 21A NEMA | datasheet.pdf | |
![]() | LFSCM3GA40EP1-6FF1020I | IC FPGA 562 I/O 1020BGA | datasheet.pdf | |
![]() | 44543-2010 | HP2011-021S, 2 N/C + 1 N/O, M16 | datasheet.pdf | |
![]() | 3-2176069-2 | RES SMD 590K OHM 1% 1/20W 0201 | datasheet.pdf | |
![]() | CA13307_LAURA-O-WAS-PIN | LED ASSY 1POS 21.6MM SQ WHITE | datasheet.pdf |