Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV07RW-25-187PB | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV07RW-25-187PB | |
| Related Links | CTV07RW-, CTV07RW-25-187PB Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | LT1673CS8 | IC OPAMP GP 12KHZ RRO 8SO | datasheet.pdf | |
![]() | MIC59P60YWM | IC DRVR LATCH 8BIT PAR IN 20SOIC | datasheet.pdf | |
![]() | STM6825RWY6F | IC SUPERVISOR TIMR/RESET SOT23-5 | datasheet.pdf | |
![]() | RT0805CRE0720K5L | RES SMD 20.5KOHM 0.25% 1/8W 0805 | datasheet.pdf | |
![]() | TNPW0603178KBEEN | RES SMD 178K OHM 0.1% 1/10W 0603 | datasheet.pdf | |
![]() | 951436-9061906-AR | CONN HDR STR STACK 36POS 2MM T/H | datasheet.pdf | |
![]() | BC32716_J35Z | TRANS PNP 45V 0.8A TO-92 | datasheet.pdf | |
![]() | RNC50H9101BSB14 | RES 9.1K OHM 1/10W .1% AXIAL | datasheet.pdf | |
![]() | DJT16E9-98JA-LC | CONN HSG PLUG STRGHT 3POS SKT | datasheet.pdf | |
![]() | CDC4D20NP-561KC | FIXED IND 560UH 105MA 8.4 OHM | datasheet.pdf | |
![]() | WF103 | COLD SHRINK INSULATOR | datasheet.pdf | |
![]() | 132504-001 | TOOLING | datasheet.pdf |