Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTVPS00RF-15-19BC | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTVPS00RF-15-19BC | |
| Related Links | CTVPS00R, CTVPS00RF-15-19BC Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | SA20CA-TP | TVS DIODE 20VWM 32.4VC DO15 | datasheet.pdf | |
![]() | RG2012P-2802-D-T5 | RES SMD 28K OHM 0.5% 1/8W 0805 | datasheet.pdf | |
![]() | ACM28DRYI-S13 | CONN EDGECARD EXTEND 56POS 0.156 | datasheet.pdf | |
![]() | GEM25DRST-S288 | CONN EDGECARD 50POS .156 EXTEND | datasheet.pdf | |
![]() | 4-1105100-1 | HE/HA-C-STI.AG.2,5 | datasheet.pdf | |
![]() | RPP20-483.3SW/N | CONV DC/DC 20W 18-75VIN 3.3VOUT | datasheet.pdf | |
![]() | CA3100E14S-11SB03 | CONN RCPT 4POS WALL MNT W/SKTS | datasheet.pdf | |
![]() | VI-B1D-IV-F2 | CONVERTER MOD DC/DC 85V 150W | datasheet.pdf | |
![]() | 55A4832-16-MST3-9CS2275 | 55A CABLE/DUAL 10/ SM | datasheet.pdf | |
![]() | SIT9002AC-38N25EX | OSC MEMS PROG | datasheet.pdf | |
![]() | OP-260EJ | DUAL, HIGH-SPEED, CURRENT FEEDBACK, OPERATIONAL AMPLIFIER IC | datasheet.pdf | |
![]() | DD0763B102K500 | Capacitors Inductors Filters... | datasheet.pdf |