Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTVPS00RF-25-11S-LC | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors - Housings | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTVPS00RF-25-11S-LC | |
| Related Links | CTVPS00RF, CTVPS00RF-25-11S-LC Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | DF1BD-3P-2.5DSA(05) | CONN HEADER 3POS 2.5MM STR TIN | datasheet.pdf | |
![]() | P51-100-S-G-M12-5V-000-000 | SENSOR 100PSIS 1/8 NPT 5V | datasheet.pdf | |
![]() | UC3176QPTR | IC OPAMP POWER 1MHZ 28PLCC | datasheet.pdf | |
![]() | HFBR-0538 | KIT EVAL FIBER OPTIC INTERBUS | datasheet.pdf | |
![]() | 1546174-9 | Connector Barrier Block Strip 17 Circuit 0.375" (9.53mm) | datasheet.pdf | |
![]() | VI-25N-EX-F1 | CONVERTER MOD DC/DC 18.5V 75W | datasheet.pdf | |
![]() | CMF552K7000FHRE | RES 2.7K OHM 1/2W 1% AXIAL | datasheet.pdf | |
![]() | 7211SPD9AV2QE | SWITCH TOGGLE SP3T 5A 120V | datasheet.pdf | |
![]() | V28B3V3C75BN3 | CONVERTER MOD DC/DC 3.3V 75W | datasheet.pdf | |
![]() | SGNMNC2156EK | CAP TRIM 1.5-15PF 6KV CHASS MNT | datasheet.pdf | |
![]() | GTS06-14S-2S | GT 4C 4#16S SKT PLUG | datasheet.pdf | |
![]() | 1907125-1 | C/A FO LC BLU MTRJ ZIPCORD 62 | datasheet.pdf |