Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTVPS00RF-25-90SD | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTVPS00RF-25-90SD | |
| Related Links | CTVPS00R, CTVPS00RF-25-90SD Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | XC9572XL-7TQG100C | IC CPLD 72MC 7.5NS 100TQFP | datasheet.pdf | |
| RSMF1FB464R | RES MO 1W 464 OHM 1% AXIAL | datasheet.pdf | ||
![]() | KTR18EZPJ273 | RES SMD 27K OHM 5% 1/4W 1206 | datasheet.pdf | |
![]() | LT3494AEDDB#TRPBF | IC REG BOOST ADJ 225MA 8DFN | datasheet.pdf | |
![]() | 468MP-12 | TAPE ADHESIVE TRANSFER 12"X 60YD | datasheet.pdf | |
![]() | REC3.5-0524SRW/R10/A/X1 | CONV DC/DC 3.5W 4.5-9VIN 24VOUT | datasheet.pdf | |
![]() | VI-JTZ-IX-F4 | CONVERTER MOD DC/DC 2V 30W | datasheet.pdf | |
![]() | 4STD15PAM99A10X | D-Sub Connector Plug, Male Pins 9 Position Free Hanging (In-Line) Solder Cup | datasheet.pdf | |
![]() | ER1641-222KP | FIXED IND 2.2UH 650MA 190 MOHM | datasheet.pdf | |
![]() | ABC65DTMH | CONN EDGECARD 130POS .100" | datasheet.pdf | |
![]() | ATS-16H-29-C3-R0 | HEATSINK 70X70X20MM XCUT T412 | datasheet.pdf | |
![]() | XQ4085XL-3CB432N | QML High-Reliability FPGAs IC | datasheet.pdf |