Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTVS01RF9-98P | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTVS01RF9-98P | |
| Related Links | CTVS01, CTVS01RF9-98P Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | 3266W-1-204LF | TRIMMER 200K OHM 0.25W PC PIN | datasheet.pdf | |
![]() | EEM24DTAH | CONN EDGECARD 48POS R/A .156 SLD | datasheet.pdf | |
![]() | GBM22DTBI-S189 | CONN EDGECARD 44POS R/A .156 SLD | datasheet.pdf | |
![]() | SN74ABT540NSR | IC BUFF/DVR 3-ST OCTAL 20SO | datasheet.pdf | |
![]() | IDT71P71804S250BQG | IC SRAM 18MBIT 250MHZ 165CABGA | datasheet.pdf | |
![]() | 5561505801F | LED PNL MT 1" 125VAC WT FLAT RED | datasheet.pdf | |
![]() | V24B3V3H100BF3 | CONVERTER MOD DC/DC 3.3V 100W | datasheet.pdf | |
![]() | M55342H06B4E32RT5 | RES SMD 4.32K OHM 1% 0.15W 0705 | datasheet.pdf | |
![]() | CMF558M0600GNEB | RES 8.06M OHM 1/2W 2% AXIAL | datasheet.pdf | |
![]() | 5325C SL001 | CABLE 27COND 20AWG SHLD 1000' | datasheet.pdf | |
![]() | ECC10DPMH | CONN EDGECARD 20POS .100" | datasheet.pdf | |
![]() | SIT3808AC-C-33SY | OSC MEMS PROG 3.3V SMD | datasheet.pdf |