Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTVS06RF-15-5A | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTVS06RF-15-5A | |
| Related Links | CTVS06R, CTVS06RF-15-5A Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | 83808-20100 | C SH TII CLOSED | datasheet.pdf | |
![]() | MAX16999AUA13+ | IC REG LDO 1.3V 0.1A 8UMAX | datasheet.pdf | |
| UPM1E182MHD | CAP ALUM 1800UF 20% 25V RADIAL | datasheet.pdf | ||
![]() | VE-224-MY-S | CONVERTER MOD DC/DC 48V 50W | datasheet.pdf | |
![]() | VE-274-EX-S | CONVERTER MOD DC/DC 48V 75W | datasheet.pdf | |
![]() | PAXR0000 | TACHOMETER LED 5 CHAR 85-250V | datasheet.pdf | |
![]() | CR0603-FX-1273ELF | RES SMD 127K OHM 1% 1/10W 0603 | datasheet.pdf | |
![]() | 803-83-058-53-001101 | Connector Socket 58 Position 0.100" (2.54mm) Gold Through Hole | datasheet.pdf | |
![]() | 68438-338H | BERGSTIK II 0.100" DUAL ST | datasheet.pdf | |
![]() | 1443530 | CABLE 5POS | datasheet.pdf | |
![]() | MP8903DG-2.85-LF-P | IC REG LDO 2.85V/ADJ 0.15A | datasheet.pdf | |
![]() | CTVPS00RF-17-99AE | CTV 23C 21#20 2#16 PIN RECP | datasheet.pdf |