Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTVS07RF-17-35BC | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTVS07RF-17-35BC | |
| Related Links | CTVS07RF, CTVS07RF-17-35BC Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | 1649160000 | TERM BLOCK HDR 15POS VERT 5.08MM | datasheet.pdf | |
![]() | WHB1R0FET | RES 1 OHM 1W 1% AXIAL | datasheet.pdf | |
![]() | 3-644803-3 | CONN HEADER RTANG .100 13POS TIN | datasheet.pdf | |
![]() | ERJ-S06F8203V | RES SMD 820K OHM 1% 1/8W 0805 | datasheet.pdf | |
![]() | 1812HA221KATBE | CAP CER 220PF 3KV NP0 1812 | datasheet.pdf | |
![]() | CRCW060312K1FKEAHP | RES SMD 12.1K OHM 1% 1/4W 0603 | datasheet.pdf | |
![]() | 172052-8 | 8P MTEI RCPT HSG ASY 24 | datasheet.pdf | |
![]() | 201LS3 | SW SIDE ROTARY SPDT ENCLSD 120V | datasheet.pdf | |
![]() | LT1529IT#06PBF | IC REG LDO ADJ 3A TO220-5 | datasheet.pdf | |
![]() | SP1-2/0-Q | BRONZE SERV POST CONN #1 SOL-2/ | datasheet.pdf | |
![]() | GHC2/0-12-C | CONN GROUNDING HUB BRONZE | datasheet.pdf | |
![]() | BFC233861474 | CAP FILM 0.47 UF 10% 300 VAC RAD | datasheet.pdf |