Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-D38999/26KD19JN | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | D38999/26KD19JN | |
| Related Links | D38999/, D38999/26KD19JN Datasheet, Amphenol Aerospace Operations Distributor | |
| UHE1A122MPT | CAP ALUM 1200UF 20% 10V RADIAL | datasheet.pdf | ||
![]() | WHC330FET | RES 330 OHM 2W 1% AXIAL | datasheet.pdf | |
![]() | 25J6K8 | RES 6.8K OHM 5W 5% AXIAL | datasheet.pdf | |
![]() | MCF5475ZP266 | IC MCU 32BIT ROMLESS 388PBGA | datasheet.pdf | |
![]() | TPPM0110DWP | IC REG LDO 3.3V/1.8V 20SOPWRPAD | datasheet.pdf | |
![]() | 97-3106A-24-19P | CONN PLUG 12POS STRAIGHT W/PIN | datasheet.pdf | |
![]() | ABB15DYHN | CONN EDGE DUAL .050 TH 30POS | datasheet.pdf | |
![]() | LMR358FVT-GE2 | IC OPAMP LP GP 8TSSOP | datasheet.pdf | |
![]() | 82/0112-26-9 | CABLE STRANDED | datasheet.pdf | |
![]() | 3-1472969-2 | RELAY TIME DELAY | datasheet.pdf | |
![]() | QUP3OR | QUP3OR | datasheet.pdf | |
![]() | 2201751 | ELECTRONIC HOUSING COVER | datasheet.pdf |