Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-D38999/26LD15BN | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors - Housings | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | D38999/26LD15BN | |
| Related Links | D38999/, D38999/26LD15BN Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | CRCW02013K00JNED | RES SMD 3K OHM 5% 1/20W 0201 | datasheet.pdf | |
![]() | DS1077U-133+ | IC OSC DUAL FX FREQ PROG 8USOP | datasheet.pdf | |
![]() | LB15RKG01-28-BJ | SWITCH PUSH SPDT 0.4VA 28V | datasheet.pdf | |
![]() | SMZJ3804AHE3/52 | DIODE ZENER 43V 1.5W DO214AA | datasheet.pdf | |
![]() | RNV14FAL150K | RES MF HV .25W 150K OHM 1% AXIAL | datasheet.pdf | |
![]() | 0761551814 | IMPACT BP 4X8 LW SN | datasheet.pdf | |
![]() | VI-B54-IV-S | CONVERTER MOD DC/DC 48V 150W | datasheet.pdf | |
![]() | VI-2WY-CX-B1 | CONVERTER MOD DC/DC 3.3V 49.5W | datasheet.pdf | |
![]() | 7201SPDWMES | SWITCH TOGGLE DPDT 5A 120V | datasheet.pdf | |
![]() | 100DP7T2B4M6RE | SWITCH TOGGLE SP3T 0.4VA 20V | datasheet.pdf | |
![]() | 410-87-242-41-001101 | Connector Socket 42 Position 0.100" (2.54mm) Gold Through Hole | datasheet.pdf | |
![]() | HIF3BAF-40PA-2.54WB(71) | CONN HDR 40POS 2.54MM | datasheet.pdf |