Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-ELM 1-275 | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1,000 | |
| Category | Optoelectronics | |
| Family | LEDs - Spacers, Standoffs | |
| Series | ELM 1 | |
| Color | Black | |
| Length | 0.275" (6.99mm) | |
| LED | T1 3/4 | |
| Material | PVC | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | ELM 1-275 | |
| Related Links | ELM , ELM 1-275 Datasheet, Bivar, Inc. Distributor | |
![]() | RM15WTP-CP10 | CONN CABLE CLAMP SZ15 M16 SILVER | datasheet.pdf | |
![]() | MBB02070C1218FRP00 | RES 1.21 OHM 0.6W 1% AXIAL | datasheet.pdf | |
![]() | HLMP-LB65-RU0DD | LED BLUE DIFF 4MM OVAL T/H | datasheet.pdf | |
![]() | CCF0.25TB | CLEAN CUT FR 1/4" BLK/WHT 1000' | datasheet.pdf | |
![]() | VI-B3Z-IX-F4 | CONVERTER MOD DC/DC 2V 30W | datasheet.pdf | |
![]() | Z60-10-L-U | AC/DC PROGRAMMABLE SUPPLY 0-60V | datasheet.pdf | |
![]() | CWB1503S | ANT WHIP WB 5/8 150-162MHZ | datasheet.pdf | |
![]() | 316-83-144-41-009101 | Connector Socket 44 Position 0.100" (2.54mm) Gold Through Hole | datasheet.pdf | |
![]() | JCJ1048S12 | DC/DC CONVERTER 12V 10W | datasheet.pdf | |
![]() | DBMME9W4SA197 | COMBO 9W4 F SOD G50 TIN | datasheet.pdf | |
![]() | MS24266R24B61PN | 26500 61C 61#20 PIN PLUG | datasheet.pdf | |
![]() | MAL209051222E3 | 2200UF 50V 22X25MM 105C 5000H | datasheet.pdf |