Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-GP3106A-28-21P | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | - | |
| Packaging | - | |
| Connector Type | - | |
| Number of Positions | - | |
| Shell Size - Insert | - | |
| Shell Size, MIL | - | |
| Mounting Type | - | |
| Termination | - | |
| Fastening Type | - | |
| Orientation | - | |
| Ingress Protection | - | |
| Shell Material, Finish | - | |
| Contact Finish | - | |
| Features | - | |
| Contact Finish Thickness | - | |
| Current Rating | - | |
| Voltage - Rated | - | |
| Operating Temperature | - | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | GP3106A-28-21P | |
| Related Links | GP3106A, GP3106A-28-21P Datasheet, Amphenol Industrial Distributor | |
![]() | SN65LVDM31-32BEVM | EVAL MOD FOR SN65LVDM31/LVDS32B | datasheet.pdf | |
![]() | EN95F2X3 | BATTERY PK 9.0V D SIZE ALKALINE | datasheet.pdf | |
![]() | LTC2922CF-3.3#PBF | IC 5 PWR SUPPLY MONITOR 20TSSOP | datasheet.pdf | |
![]() | SN74ALS299DWR | IC REGISTER SHIFT/STORAGE 20SOIC | datasheet.pdf | |
![]() | CLS0201MA-L152 | SPEAKER 8OHMS .5W 20MM 6" LEADS | datasheet.pdf | |
![]() | 20020006-G171B01LF | 500 TB PLG PLUG 180 | datasheet.pdf | |
![]() | NTMFS4C55NT1G | MOSFET N-CH 30V 78A SO8FL | datasheet.pdf | |
![]() | WR-40PB-VF50-N1-C100 | CONN HEADER 0.5MM 40POS SMD R/A | datasheet.pdf | |
![]() | D38999/20LC4JN-LC | TV 4C 4#16 SKT RECP | datasheet.pdf | |
![]() | D38999/26SD97BN | TV 12C 8#20 4#16 SKT PLUG | datasheet.pdf | |
![]() | 600D176F200DJ5 | 17UF 200V 9.53X41.28 AXI | datasheet.pdf | |
![]() | 97-3106A32-13PW | AB 23C 18#16, 5#12 PIN PLUG | datasheet.pdf |