Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-LCC2-14AWF-Q | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Terminals - Rectangular Connectors | |
| Series | Pan-Lug® | |
| Packaging | Bulk | |
| Terminal Type | Rectangular Tongue | |
| Stud/Tab Size | 1/4 Stud | |
| Terminal Style | Two Stud Holes | |
| Tab Thickness | 0.100" (2.54mm) | |
| Length - Overall | - | |
| Width - Outer Edges | 0.600" (15.24mm) | |
| Mounting Type | Free Hanging (In-Line), Right Angle | |
| Termination | Crimp, Barrel | |
| Wire Gauge | 2 AWG | |
| Insulation | Non-Insulated | |
| Features | - | |
| Color | Brown | |
| Contact Finish | Electro-Tin | |
| Contact Material | Copper | |
| Diameter - Barrel ID | 0.310" (7.87mm) | |
| Diameter - Barrel OD | 0.420" (10.67mm) | |
| Diameter - Ring ID | 0.270" (6.86mm) | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | LCC2-14AWF-Q | |
| Related Links | LCC2-1, LCC2-14AWF-Q Datasheet, Panduit Distributor | |
![]() | 308N1MEG | POT 1M OHM 1/2W PLASTIC LINEAR | datasheet.pdf | |
![]() | FJP3305H2 | TRANS NPN 400V 4A TO-220 | datasheet.pdf | |
![]() | SCC2681TC1A44,529 | IC DUART 44PLCC | datasheet.pdf | |
![]() | MMA23-011 | CONN RACK/PANEL 11POS 5A | datasheet.pdf | |
![]() | R88M-K1K030F-OS2 | MOTOR SERVO AC INC KEY OS 1KW | datasheet.pdf | |
![]() | VI-J22-IZ-F3 | CONVERTER MOD DC/DC 15V 25W | datasheet.pdf | |
![]() | 0625001860 | VALVE | datasheet.pdf | |
![]() | E-TA2012 T 2DB N6 | ATTENUATOR 0805 SMD 2 DB | datasheet.pdf | |
![]() | XC6119N09A7R-G | IC VOLT DET TIME DLY 0.9V 4-USPN | datasheet.pdf | |
![]() | TM3D227M004EBA | TM3227M004DEBA | datasheet.pdf | |
![]() | 0625000119 | PANEL | datasheet.pdf | |
![]() | SPOD550STR | SPOD FINAL ASSEMBLY | datasheet.pdf |