Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-LJT01RT15-5P | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | LJT01RT15-5P | |
| Related Links | LJT01R, LJT01RT15-5P Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | RG1005P-1241-W-T1 | RES SMD 1.24K OHM 1/16W 0402 | datasheet.pdf | |
![]() | 32049 | SCREWDRIVER SLOTTED 4MM 9.3" | datasheet.pdf | |
![]() | MOV-20D561KTR | VARISTOR 504V 6.5KA DISC 20MM | datasheet.pdf | |
![]() | 929715-11-07-EU | CONN HEADER 14POS DUAL .100 STR | datasheet.pdf | |
![]() | RC1608J240CS | RES SMD 24 OHM 5% 1/10W 0603 | datasheet.pdf | |
![]() | S1210-392F | FIXED IND 3.9UH 441MA 830 MOHM | datasheet.pdf | |
![]() | 33571113005001 | CABLE ASSEMBLY FO HYBRID LC DUPL | datasheet.pdf | |
![]() | SFM210-LPPE-D25-ST-BK | Connector Header 50 Position 0.039" (1.00mm) Gold Through Hole | datasheet.pdf | |
![]() | MSP430FR5949IDAR | IC MCU 16BIT 64KB FRAM 38TSSOP | datasheet.pdf | |
![]() | 45370/15 BK001 | XG4 16AWG 19/.0117 15C SHLD 300V | datasheet.pdf | |
![]() | 0397370005 | HDR VERT MALE 508MM 5C MTG ENDS | datasheet.pdf | |
![]() | CTVS06RF-25-19JB-LC | CTV 19C 19#12 SKT PLUG | datasheet.pdf |