Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-MS27505E13B35PA-LC | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors - Housings | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | MS27505E13B35PA-LC | |
| Related Links | MS27505E1, MS27505E13B35PA-LC Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | 2-320569-3 | CONN RING 10-12 AWG #1/4 PIDG | datasheet.pdf | |
![]() | PM1210-R47J | FIXED IND 470NH 450MA 500 MOHM | datasheet.pdf | |
![]() | 9T04021A2102DBHF3 | RES SMD 21K OHM 0.5% 1/16W 0402 | datasheet.pdf | |
![]() | TWW5J2R0E | RES 2 OHM 5W 5% RADIAL | datasheet.pdf | |
![]() | MAL213817332E3 | CAP ALUM 3300UF 20% 40V AXIAL | datasheet.pdf | |
![]() | 241-8-56 | XFRMR LAMINATED 100VA CHAS MOUNT | datasheet.pdf | |
![]() | TPS61080EVM-147 | EVAL MODULE FOR TPS61080-147 | datasheet.pdf | |
![]() | CRCW040217R8FKEDHP | RES SMD 17.8 OHM 1% 1/8W 0402 | datasheet.pdf | |
![]() | VE-2N1-IX-B1 | CONVERTER MOD DC/DC 12V 75W | datasheet.pdf | |
![]() | VI-J5D-CX | CONVERTER MOD DC/DC 85V 75W | datasheet.pdf | |
![]() | MI-J2P-IZ-F2 | CONVERT DC/DC 28VIN 13.8VOUT 25W | datasheet.pdf | |
![]() | ATS-07F-42-C3-R0 | HEATSINK 57.9X60.96X22.86MM T412 | datasheet.pdf |