Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
Internal Part Number | EIS-P59PTSI5.E3.86 | |
Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
Production Status (Lifecycle) | Obsolete / Discontinued | |
Condition | New & Unused, Original Sealed | |
Standard Package | 1 | |
Category | Cables, Wires | |
Family | Multiple Conductor Cables | |
Series | - | |
Cable Type | Multi-Conductor | |
Number of Conductors | 2 | |
Wire Gauge | 18 AWG | |
Conductor Strand | 7/26 | |
Conductor Material | Copper, Bare | |
Jacket (Insulation) Material | - | |
Jacket (Insulation) Diameter | - | |
Shield Type | - | |
Length | - | |
Jacket Color | Natural | |
Ratings | - | |
Features | - | |
Voltage | - | |
Operating Temperature | - | |
Usage | - | |
Conductor Insulation | - | |
Jacket (Insulation) Thickness | - | |
Shield Material | - | |
Shield Coverage | - | |
Weight | 0.001 KG | |
Application | Email for details | |
Alternative Part (Replacement) | P59PTSI5.E3.86 | |
Related Links | P59PTSI, P59PTSI5.E3.86 Datasheet, General Cable Distributor |
![]() | C1005X8R1H471K050BA | CAP CER 470PF 50V X8R 0402 | datasheet.pdf | |
![]() | A165K-J3MAL | SWITCH UNIT REC 3POS MOM RIGHT | datasheet.pdf | |
![]() | V375C36C150BG3 | CONVERTER MOD DC/DC 36V 150W | datasheet.pdf | |
![]() | VE-J5F-CZ-B1 | CONVERTER MOD DC/DC 72V 25W | datasheet.pdf | |
![]() | VE-B41-MX-F4 | CONVERTER MOD DC/DC 12V 75W | datasheet.pdf | |
![]() | 0011390012 | PINSETTER KIT #204 | datasheet.pdf | |
![]() | T9-818C-4 | CIRC BREAKER PCB MNT 4A | datasheet.pdf | |
![]() | PRG3216P-5101-B-T5 | RES SMD 5.1K OHM 1W 1206 WIDE | datasheet.pdf | |
![]() | TJ05515600J0G | 508 TB PLU PLU UP/SIDE | datasheet.pdf | |
![]() | OQ063500D0J0G | 381 TB SOCKET VER SMT | datasheet.pdf | |
![]() | MAX3710ETG+T | IC LIMITING AMP LASER DVR 24TQFN | datasheet.pdf | |
![]() | A5940KLKTR-T | IC FAN DRIVER 3PH | datasheet.pdf |