Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-TV06RW-11-99JA-LC | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors - Housings | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | TV06RW-11-99JA-LC | |
| Related Links | TV06RW-1, TV06RW-11-99JA-LC Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | C3CEG-5006M | IDC CABLE - CKC50G/AE50M/CCE50G | datasheet.pdf | |
![]() | 9T08052A2400DAHFT | RES SMD 240 OHM 0.5% 1/8W 0805 | datasheet.pdf | |
![]() | FMMT413TD | TRANS NPN 50V 0.1A SOT23-3 | datasheet.pdf | |
![]() | KZE6.3VB682M16X25LL | CAP ALUM 6800UF 20% 6.3V RADIAL | datasheet.pdf | |
![]() | EBM22DTMT-S273 | CONN EDGECARD 44POS R/A .156 SLD | datasheet.pdf | |
![]() | 67997-526 | BERGSTIK II .100" DR STRAIGHT | datasheet.pdf | |
![]() | ISC1812EB271J | FIXED IND 270UH 101MA 6.9 OHM | datasheet.pdf | |
![]() | 83263644 | SWITCH SNAP ACTION 16A SPST | datasheet.pdf | |
![]() | 93944-124HLF | HEADER BERGSTIK | datasheet.pdf | |
![]() | 0309112 | CONN TERM BLOCK | datasheet.pdf | |
![]() | 52F257-002 | EMI FILTER PI TYPE | datasheet.pdf | |
![]() | 152-11359 | CABLE TIE RIVET MOUNTS | datasheet.pdf |