Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-XC6121A430MR-G | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 3,000 | |
| Category | Integrated Circuits (ICs) | |
| Family | PMIC - Supervisors | |
| Series | - | |
| Packaging | Tape & Reel (TR) | |
| Type | Watchdog Circuit | |
| Number of Voltages Monitored | 1 | |
| Output | Open Drain or Open Collector | |
| Reset | Active Low | |
| Reset Timeout | 200 ms Typical | |
| Voltage - Threshold | 3V | |
| Operating Temperature | -40°C ~ 85°C | |
| Mounting Type | Surface Mount | |
| Package / Case | SC-74A, SOT-753 | |
| Supplier Device Package | SOT-25 | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | XC6121A430MR-G | |
| Related Links | XC6121A, XC6121A430MR-G Datasheet, Torex Semiconductor Ltd Distributor | |
![]() | 0203137 | CONN TERM BLK INSERTION BRIDGE | datasheet.pdf | |
![]() | 26556 | NUT DRIVER HEX SCKT 7/32" 6.69" | datasheet.pdf | |
![]() | MAX6952EPL+ | IC DRVR DSPL LED 40-DIP | datasheet.pdf | |
![]() | DNRMV1924BK1 | SHELF FIXED 24X17.6X5.2" BLACK | datasheet.pdf | |
![]() | RWR80N8980FRBSL | RES 898 OHM 2W 1% WW AXIAL | datasheet.pdf | |
![]() | ITS13FV2SR | SWITCH TACTILE SPST-NO 0.05A 12V | datasheet.pdf | |
| XC6123A447ER-G | IC WATCHDOG TIMER 6-USP | datasheet.pdf | ||
![]() | 79243-118HLF | HEADER BERGSTIK | datasheet.pdf | |
![]() | AMC35DCKD | CONN EDGECARD 70POS .100" | datasheet.pdf | |
![]() | RJHSEJ38JA8 | RJ45 SHIELDED LED 8 PORT | datasheet.pdf | |
![]() | 722634-3 | ANVIL COMB | datasheet.pdf | |
![]() | 105MPW250K | CAP FILM 1UF 10% 250V AXIAL | datasheet.pdf |