Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-2D2G-505-ISG | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | ||
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| MSDS Material Safety Datasheet | 2 Type Closures | |
| Standard Package | 1 | |
| Category | Cables, Wires - Management | |
| Family | Splice Enclosures, Protection | |
| Series | 2D2 | |
| Type | Enclosure System, Installed Sealing Gasket | |
| Number of Cable Pairs | 3600 Pairs @ 24-26 AWG | |
| Diameter - Inside | 9.50" (241.3mm) | |
| Length - Overall | 61.50" (1.6m) | |
| Sheath Opening | 53.00" (1.3m) | |
| Features | Modular Connectors | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | 2D2G-505-ISG | |
| Related Links | 2D2G-5, 2D2G-505-ISG Datasheet, 3M Distributor | |
![]() | DV14-250MB-C | Connector Quick Connect Tab 14-16 AWG 0.250" (6.35mm) Crimp | datasheet.pdf | |
![]() | 55741-001LF | ARRAY FEMALE 200POS 1.3MM GOLD | datasheet.pdf | |
![]() | IXDD509SIAT/R | IC GATE DRIVER 9A 8-SOIC | datasheet.pdf | |
![]() | OV4ZRRRR | LED OPTIMAL IV STAR RED | datasheet.pdf | |
![]() | E36D101LPN223TDB7M | CAP ALUM 22000UF 100V SCREW | datasheet.pdf | |
![]() | 1001690000 | TERM BLOCK PLUG 18POS 5.08MM | datasheet.pdf | |
![]() | AD7988-1BRMZ | ADC 16BIT 100KSPS 1.25LSB 10MSOP | datasheet.pdf | |
![]() | PE.31.11.000016 | CABLE 4COND 10AWG BLACK 1000' | datasheet.pdf | |
![]() | 7103K19A2ME | SWITCH TOGGLE SPDT 5A 120V | datasheet.pdf | |
![]() | 68020-418HLF | BERGSTIK II SNGL RA | datasheet.pdf | |
![]() | ATS-12B-11-C2-R0 | HEATSINK 50X50X10MM XCUT T766 | datasheet.pdf | |
![]() | 101A052-3/42-0-CS8194 | STD POLY MOLDED PARTS | datasheet.pdf |