Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-2M803-001-06NF10-26SN | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | 2M803-001-06NF10-26SN | |
| Related Links | 2M803-001-, 2M803-001-06NF10-26SN Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | AD7817BRZ | SENSOR TEMPERATURE SPI 16SOIC | datasheet.pdf | |
![]() | 35941 | ARM ADJUSTABLE FOR THE EXTRACTOR | datasheet.pdf | |
![]() | RG3216N-69R8-C-T5 | RES SMD 69.8 OHM 0.25% 1/4W 1206 | datasheet.pdf | |
![]() | EMA50DTMS | CONN EDGECARD 100PS R/A .125 SLD | datasheet.pdf | |
![]() | MAX8510EXK45+T | IC REG LDO 4.5V 0.12A SC70-5 | datasheet.pdf | |
![]() | Y96E-43RD10 | CONN CORD SET R-ANGLE 22AWG 10M | datasheet.pdf | |
![]() | V28C48C100BG | CONVERTER MOD DC/DC 48V 100W | datasheet.pdf | |
![]() | VI-JNT-CZ-F2 | CONVERTER MOD DC/DC 6.5V 25W | datasheet.pdf | |
![]() | RLR07C1005GPR36 | RES 10M OHM 2% 1/4W AXIAL | datasheet.pdf | |
![]() | APGN4-34971-2 | CIRCUIT BREAKER MAG-HYDR TOGGLE | datasheet.pdf | |
![]() | 1-146475-5 | 15 MODII HDR SRST UNSHRD STKG | datasheet.pdf | |
![]() | 2-21000-5 | SCREW,CAP,SOCKET HEAD | datasheet.pdf |