Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-48-1226-02 | |
| Lead Free Status / RoHS Status | Lead free / RoHS Compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors - Contacts | |
| Series | - | |
| Packaging | Bulk | |
| Pin or Socket | Coax, Pin Center, Assembly | |
| Type | Coaxial | |
| Size | - | |
| Wire Gauge | 22 AWG | |
| Contact Termination | Crimp | |
| Contact Finish | - | |
| Contact Finish Thickness | - | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | 48-1226-02 | |
| Related Links | 48-12, 48-1226-02 Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | 322443 | CONN TAB 12-10AWG SOLIS | datasheet.pdf | |
![]() | 3399-7626 | CONN SOCKET 26POS CLOSE END GOLD | datasheet.pdf | |
![]() | MC74VHC132DR2G | IC GATE NAND 4CH 2-INP 14-SOIC | datasheet.pdf | |
![]() | ESD5V3U2U-03F E6327 | TVS DIODE 5.3VWM 15VC TSFP3 | datasheet.pdf | |
![]() | VFB600-D24-S32 | DC/DC CONVERTER 32V 18.75A | datasheet.pdf | |
![]() | CMF558K8800BEEB | RES 8.88K OHM 1/2W 0.1% AXIAL | datasheet.pdf | |
![]() | VS3-L9-B1-B2-00-CE | VS CONFIGURABLE POWER SUPPLY | datasheet.pdf | |
![]() | 0525591834 | CONN FFC VERT 18POS 0.50MM SMD | datasheet.pdf | |
![]() | 1394918-7 | DUOPLG 5.0 BU-STE 7P | datasheet.pdf | |
![]() | 753181472GPTR7 | RES ARRAY 16 RES 4.7K OHM 18DRT | datasheet.pdf | |
![]() | CN0967C20G41P6Y040 | 26500 41C 41#20 P TH RECP LC | datasheet.pdf | |
![]() | 97-4108B20-7S-621 | AB 8C 8#16 SKT PLUG | datasheet.pdf |