Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-97-3106B20-16P-940 | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | 97-3106B20-16P-940 | |
| Related Links | 97-3106B2, 97-3106B20-16P-940 Datasheet, Amphenol Industrial Distributor | |
![]() | 2N3415 | TRANS NPN 25V 0.5A TO-92 | datasheet.pdf | |
![]() | 4303.2737.01 | FUSE DRWR 100/120/220/240V 2POLE | datasheet.pdf | |
![]() | SSW-138-02-G-S-RA | Connector Receptacle 38 Position 0.100" (2.54mm) Gold Through Hole, Right Angle | datasheet.pdf | |
![]() | RNF14BAE44K2 | RES 44.2K OHM 1/4W .1% AXIAL | datasheet.pdf | |
![]() | C1808C331MGRACTU | CAP CER 330PF 2KV X7R 1808 | datasheet.pdf | |
![]() | PSC12R-090 | AC/DC WALL MOUNT ADAPTER 9V 10W | datasheet.pdf | |
![]() | OSTHT085080 | CON TERMINAL BLOCK SPRING CLAMP | datasheet.pdf | |
![]() | MAX34561EVKIT# | EVAL KIT DUAL E-FUSE 24-TQFN | datasheet.pdf | |
![]() | M55342H04B487BRWS | RES SMD 487K OHM 0.1% 0.15W 1505 | datasheet.pdf | |
![]() | ISL80138IVEAJZ-T7A | IC REG LDO ADJ 0.15A 14HTSSOP | datasheet.pdf | |
![]() | EKI-5524SS-AE | ETH SW 4PORT 10/100M +2 S.M | datasheet.pdf | |
![]() | C48-16R16Y24S7-402 | 26500 24C 24#20 S BY PLUG WC | datasheet.pdf |