Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-97-3107A20-6PX-940 | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | 97-3107A20-6PX-940 | |
| Related Links | 97-3107A2, 97-3107A20-6PX-940 Datasheet, Amphenol Industrial Distributor | |
![]() | LEDS2M-480-01 | LED SPACER MOLDED (T1 3/4) .480" | datasheet.pdf | |
![]() | 3006Y-1-203LF | TRIMMER 20K OHM 0.75W PC PIN | datasheet.pdf | |
![]() | 533015-2 | Connector Receptacle 10 Position 0.100" (2.54mm) Gold Through Hole | datasheet.pdf | |
![]() | FMM36DREH | CONN EDGECARD 72POS .156 EYELET | datasheet.pdf | |
![]() | KJL6T25N37SN | CONN PLUG 37POS STRGHT W/SCKT | datasheet.pdf | |
![]() | LPSC0002Z | FUSE HLDR CART 600V 30A DIN RAIL | datasheet.pdf | |
![]() | 433615-25-0 | Connector Barrier Block Strip 25 Circuit 0.438" (11.12mm) | datasheet.pdf | |
![]() | ATS-07A-53-C3-R0 | HEATSINK 30X30X30MM L-TAB T412 | datasheet.pdf | |
![]() | 0011183075 | K60739A TOOL KIT | datasheet.pdf | |
![]() | FA-238 25.0000MB-G3 | CRYSTAL 25.00 MHZ 20.0PF SMD | datasheet.pdf | |
![]() | 55A6053-24-MST4-9CS2275 | 55A CABLE/DUAL 10/ SM | datasheet.pdf | |
![]() | 75-068228-22P | ER 6C 3#16 3#4 PIN RECP | datasheet.pdf |