Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-97-3107B22-19SY | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | 97-3107B22-19SY | |
| Related Links | 97-3107, 97-3107B22-19SY Datasheet, Amphenol Industrial Distributor | |
![]() | 131-3701-266 | CONN SMB JACK STR 50 OHM PCB | datasheet.pdf | |
![]() | MCR006YZPF1001 | RES SMD 1K OHM 1% 1/20W 0201 | datasheet.pdf | |
![]() | RGEF600-2 | POLYSWITCH PTC RESET 6A HLD T/R | datasheet.pdf | |
![]() | 960264-6303-AR | Connector Receptacle 64 Position 0.100" (2.54mm) Gold Through Hole | datasheet.pdf | |
![]() | REC5-483.3SRW/H/B/M | CONV DC/DC 5W 36-72VIN 3.3VOUT | datasheet.pdf | |
![]() | CW01012R00JB12 | RES 12 OHM 10W 5% AXIAL | datasheet.pdf | |
![]() | VI-J4F-EY | CONVERTER MOD DC/DC 72V 50W | datasheet.pdf | |
![]() | LSYMB4N | SWITCH 2NC 2NO DPDT CTRNEUT 120V | datasheet.pdf | |
![]() | IMP1-3S2-2F2-1P0-00-A | IMP CONFIGURABLE POWER SUPPLY | datasheet.pdf | |
![]() | 7101SYCME | SWITCH TOGGLE SPDT 5A 120V | datasheet.pdf | |
![]() | VJ0402D430KXAAJ | CAP CER 43PF 50V NP0 0402 | datasheet.pdf | |
![]() | MS3120F8-33PW | PTSE 3C 3#20 PIN RECP | datasheet.pdf |