Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
Internal Part Number | EIS-C48-06R24-57P-102 | |
Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
Production Status (Lifecycle) | In Production | |
Condition | New & Unused, Original Sealed | |
Standard Package | 1 | |
Category | Connectors, Interconnects | |
Family | Circular Connectors | |
Series | * | |
Weight | 0.001 KG | |
Application | Email for details | |
Alternative Part (Replacement) | C48-06R24-57P-102 | |
Related Links | C48-06R2, C48-06R24-57P-102 Datasheet, Bel Fuse Inc. Distributor |
![]() | HCF4069UM013TR | IC HEX INVERTER 14 SOIC | datasheet.pdf | |
![]() | RR1220P-7870-D-M | RES SMD 787 OHM 0.5% 1/10W 0805 | datasheet.pdf | |
![]() | SR072A560KAATR2 | CAP CER 56PF 200V NP0 RADIAL | datasheet.pdf | |
![]() | PM5-A12G28V | PANEL MOUNT ASSEM GREEN, 6.1MM | datasheet.pdf | |
![]() | VI-BWD-CY-F1 | CONVERTER MOD DC/DC 85V 50W | datasheet.pdf | |
![]() | RLR07C2944FSRSL | RES 2.94M OHM 1% 1/4W AXIAL | datasheet.pdf | |
![]() | RNC55J3970DSRSL | RES 397 OHM 1/8W .5% AXIAL | datasheet.pdf | |
![]() | CDEP147NP-2R4MC-95 | FIXED IND 2.4UH 17.5A 3.23 MOHM | datasheet.pdf | |
![]() | MT29F1G08ABADAH4-ITX:D TR | IC FLASH 1GBIT 63VFBGA | datasheet.pdf | |
![]() | 416F52035AST | CRYSTAL 52.000 MHZ SERIES SMT | datasheet.pdf | |
![]() | MKP386M533100YT3 | MKP 3.3UF 5% 1000VDC DRAWING T3 | datasheet.pdf | |
![]() | MAL210456472E3 | 4700UF 400V 76X146MM 105C 5000H | datasheet.pdf |