Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV06RW-21-41BB | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV06RW-21-41BB | |
| Related Links | CTV06RW, CTV06RW-21-41BB Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | L4931CZ50 | IC REG LDO 5V 0.25A TO92-3 | datasheet.pdf | |
![]() | ADNK-5023-CY02 | KIT SAMPLE FOR ADNS-5023 | datasheet.pdf | |
![]() | RG2012N-2672-B-T1 | RES SMD 26.7K OHM 0.1% 1/8W 0805 | datasheet.pdf | |
![]() | RNF14BAE48K1 | RES 48.1K OHM 1/4W .1% AXIAL | datasheet.pdf | |
![]() | 160773-3 | Connector Quick Connect Receptacle 15.5-20 AWG 0.250" (6.35mm) Crimp | datasheet.pdf | |
![]() | D38999/24WF32SA | CONN RCPT 32POS JAM NUT W/SCKT | datasheet.pdf | |
![]() | VI-B24-EY-F2 | CONVERTER MOD DC/DC 48V 50W | datasheet.pdf | |
![]() | DTS26W21-11JD | CONN PLUG 11POS STRGHT W/SKT | datasheet.pdf | |
![]() | CMF559K7600JKBF | RES 9.76K OHM 1/2W 5% AXIAL | datasheet.pdf | |
![]() | ABM22DRKH-S328 | CONN EDGECARD 44POS .156" | datasheet.pdf | |
![]() | 202K163-25-G03/86-0 | MOLDED PARTS | datasheet.pdf | |
![]() | C48-10R24-57P9-106 | 26500 57C 55#20 2#12 PIN RECP | datasheet.pdf |