Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV06RW-25-24JB | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV06RW-25-24JB | |
| Related Links | CTV06RW, CTV06RW-25-24JB Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | 172-025-142-011 | D-Sub Connector Plug, Male Pins 25 Position Through Hole Wire Wrap | datasheet.pdf | |
![]() | MPC8264AVVPJDB | IC MPU MPC82XX 300MHZ 408TBGA | datasheet.pdf | |
![]() | WW12FBR240 | RES 0.24 OHM 0.4W 1% AXIAL | datasheet.pdf | |
![]() | JX7011D0104.000000 | OSC XO 104.000MHZ CMOS SMD | datasheet.pdf | |
![]() | VE-26H-CU-F4 | CONVERTER MOD DC/DC 52V 200W | datasheet.pdf | |
![]() | VE-J0M-CX-F1 | CONVERTER MOD DC/DC 10V 75W | datasheet.pdf | |
![]() | CMDA19AY7D1S | LED GREEN DIFFUSED 0603 SMD | datasheet.pdf | |
![]() | IMP1-3Y0-1Y0-4NN0-4QE0-30-A | IMP CONFIGURABLE POWER SUPPLY | datasheet.pdf | |
![]() | RN60D1253FR36 | RES 125K OHM 1/4W 1% AXIAL | datasheet.pdf | |
![]() | PHP00603E1141BBT1 | RES SMD 1.14K OHM 0.1% 3/8W 0603 | datasheet.pdf | |
![]() | SG-615P 10.0000MC3: PURE SN | OSC 10.00 MHZ 5.0V SMD | datasheet.pdf | |
![]() | LT8631EFE#TRPBF | IC REG BUCK ADJ 1A 20TSSOP | datasheet.pdf |