Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV06RW-25-29B | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV06RW-25-29B | |
| Related Links | CTV06RW, CTV06RW-25-29B Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | 74HCT138N,652 | IC DECODER/DEMUX 3-8 LINE 16DIP | datasheet.pdf | |
![]() | FSM02DSEN-S13 | CONN EDGECARD 4POS .156 EXTEND | datasheet.pdf | |
![]() | D38999/26FF35PA | CONN PLUG 66POS STRAIGHT W/PINS | datasheet.pdf | |
![]() | 966208-2000-AR-TP | Connector Receptacle, Pass Through 8 Position 0.100" (2.54mm) Gold Surface Mount | datasheet.pdf | |
![]() | SMCG18CAHE3/57T | TVS DIODE 18VWM 29.2VC SMC | datasheet.pdf | |
![]() | ACCB032 | SEALING BOOT FOR ST1 SERIES TOGG | datasheet.pdf | |
![]() | VE-B50-EV-F2 | CONVERTER MOD DC/DC 5V 150W | datasheet.pdf | |
![]() | B82496C3221G | FIXED IND 220NH 110MA 7 OHM SMD | datasheet.pdf | |
![]() | M55342E04B280ART5 | RES SMD 280 OHM 0.1% 0.15W 1505 | datasheet.pdf | |
![]() | 5V19EE903NLGI | IC CLOCK GENERATOR | datasheet.pdf | |
![]() | MCR10ERTF2611 | RES SMD 2.61K OHM 1% 1/8W 0805 | datasheet.pdf | |
![]() | SIT1602ACE7-18E | OSC MEMS PROG 2.0X1.6MM 1.8V | datasheet.pdf |