Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
Internal Part Number | EIS-CTV07RW-11-19PC-P2AD | |
Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
Production Status (Lifecycle) | In Production | |
Condition | New & Unused, Original Sealed | |
Standard Package | 1 | |
Category | Connectors, Interconnects | |
Family | Circular Connectors | |
Series | * | |
Weight | 0.001 KG | |
Application | Email for details | |
Alternative Part (Replacement) | CTV07RW-11-19PC-P2AD | |
Related Links | CTV07RW-11, CTV07RW-11-19PC-P2AD Datasheet, Amphenol Aerospace Operations Distributor |
![]() | 1755720000 | TERM BLOCK HDR 14POS R/A 3.5MM | datasheet.pdf | |
![]() | 9755-CLEAR-3/4 | TAPE TRANSFER ADHESIVE 3/4"X60YD | datasheet.pdf | |
![]() | 1674723 | INSERT MALE 108POS CRIMP | datasheet.pdf | |
![]() | 34ADP12B4V3RT | SWITCH TOGGLE DPDT 0.4VA 20V | datasheet.pdf | |
![]() | 0760445003 | CONN STACKED SFP+ 2X1 40POS | datasheet.pdf | |
![]() | VE-J4Y-EW-F2 | CONVERTER MOD DC/DC 3.3V 66W | datasheet.pdf | |
![]() | 10-470732-12P | CONN PLUG W/PINS | datasheet.pdf | |
![]() | PC06P-12-4S(SR) | CONN PLUG 4POS INLINE SKT | datasheet.pdf | |
![]() | 0578865000 | 1.0 I/O 68P CRIMP JIG | datasheet.pdf | |
![]() | IELBXK1-1-72-20.0-GK-N6-V | CIR BRKR MAG-HYDR LEVER 20A | datasheet.pdf | |
![]() | MKP383511040JKI2B0 | CAP FILM 400VDC 1.1UF RADIAL | datasheet.pdf | |
![]() | GTS08F18-1P | GT 10C 10#16 PIN PLUG RTANG | datasheet.pdf |