Ship from: HONGKONG
Date Code: Newest Date Code
Manufacturer lead time 6 weeks
| Internal Part Number | EIS-CTV07RW-19-28BB | |
| Lead Free Status / RoHS Status | Contains lead / RoHS non-compliant | |
| Moisture Sensitivity Level (MSL) | 1 (Unlimited) | |
| Production Status (Lifecycle) | In Production | |
| Condition | New & Unused, Original Sealed | |
| Standard Package | 1 | |
| Category | Connectors, Interconnects | |
| Family | Circular Connectors | |
| Series | * | |
| Weight | 0.001 KG | |
| Application | Email for details | |
| Alternative Part (Replacement) | CTV07RW-19-28BB | |
| Related Links | CTV07RW, CTV07RW-19-28BB Datasheet, Amphenol Aerospace Operations Distributor | |
![]() | SSQ-148-03-T-S | Connector Receptacle 48 Position 0.100" (2.54mm) Tin Through Hole | datasheet.pdf | |
![]() | UP050CH621J-KFCZ | CAP CER 620PF 50V C0H AXIAL | datasheet.pdf | |
| AOZ1210AI | IC REG BUCK ADJ 2A 8SOIC | datasheet.pdf | ||
![]() | FVXO-LC53B-56.244 | OSC VCXO 56.244MHZ LVDS SMD | datasheet.pdf | |
![]() | 767006-7 | CONN PLUG 266POS R/A .025 SMD | datasheet.pdf | |
![]() | XR16M681IL32-F | IC UART FIFO 64B 32QFN | datasheet.pdf | |
![]() | DS-DSP-ST-UR1 | LICENSE DESIGN SUITE DSP 1YEAR | datasheet.pdf | |
![]() | RNR50J1622FSB14 | RES 16.2K OHM 1/10W 1% AXIAL | datasheet.pdf | |
![]() | 100YXM1MEFCT15X11 | CAP ALUM 1UF 20% 100V RADIAL | datasheet.pdf | |
![]() | 71CF30-1AL-1AL | SWITCH ROTARY | datasheet.pdf | |
![]() | FLP25R13.0-SR | LIGHT PIPE ASSY | datasheet.pdf | |
![]() | 97-3106B24-11P-417-940 | AB 9C 6#12, 3#8 PIN PLUG | datasheet.pdf |